I. CEMENT PLANTS
Description |
PRS gas waste heat recovery + CSP |
|
Location |
Ait Baha | Morocco |
Customer |
Italecementi Group |
Heat source |
Exhaust gas @ 330°C cooled down to 220°C |
Clinker production capacity |
≈ 5.000 ton/day |
ORC electric power |
2 MWe |
ORC model |
T1500 HR |
In operation since |
Q4 2010 |
Click on photos to enlarge
Description |
Thermal oil (PRS) and pressurised water (CC) |
|
Location |
Alesd | Romania |
Customer |
Holcim Romania | Holcim Group |
Heat source |
Exhaust gas @ 360°C (PRS) and air @ 250 °C (CC) |
Clinker production capacity |
≈ 4.000 ton/day |
ORC electric power |
4 MWe |
ORC model |
TURBODEN 40 HR Split |
In operation since |
Q2 2012 |
Click on photos to enlarge
Description |
Thermal oil heat recovery loops (PRS & CC) |
|
Location |
Slovakia |
Customer |
Holcim Slovakia | Holcim Group |
Heat source |
Exhaust gas @ 360°C (PRS) & hot air @ 310 °C (CC) |
Clinker production capacity |
≈ 3.600 ton/day |
ORC electric power |
4967 KWe |
ORC model |
TURBODEN 50 HR |
Water temperature (in/out) |
21 - 33°C |
In operation since |
Under Construction |